Home/Get a quote

Four answers and we can price it

Four answers and we can price your ESD floor

Square footage, what is on the slab now, the resistance band your specification calls for, and the hours the space can be handed over. That is enough to price the actual job instead of a range.

Cure schedule at 70 F and 50 percent relative humidityCoating down24 hours7 daysFoot traffic at 24 hours.Full vehicle and forklift traffic at 7 days.A colder room runs longer: about 36 hours to foot traffic at 50 F.MANUFACTURER TDS · 70 F, 50% RH
Plan the cure, not the install. The second number is the one that decides when the room goes back to work.
A bright electronics assembly room with benches and pick and place machines
Rooms like this are what the floor has to protect
ESD Flooring TexasESD Flooring Texas

Send it over

Nothing here is required except a way to reach you. Partial information is fine, we will ask about the rest.

0 of 5 answered

Drawings, specs, audit findings
    With a keyboard or screen reader, press Enter or Space to send. With a mouse or finger, hold the button for a moment.

    What happens next

    Three steps, and only the first one needs anything from you.

    01

    You send what you are holding

    Where conductive and static dissipative sit on the resistance scale 10³10⁴10⁵10⁶10⁷10⁸10⁹10¹⁰10¹¹10¹²10¹³ CONDUCTIVE STATIC DISSIPATIVE INSULATIVE 2.5 x 10⁴ to 1.0 x 10⁶ ohms. Fastest bleed. Specified where a spark is the hazard. Anything above 10⁹ is an insulator and holds a charge instead of moving it. ANSI/ESD STM7.1 · bands published by the ESD Association
    The two static control bands, drawn where they sit on the scale. Everything to the right of 10⁹ ohms is an insulator.

    A specification section, an audit finding, a customer requirement, even a photo of the slab. That document names the band, the test method and what has to be handed over at the end, which is most of the pricing decision already made.

    02

    We read the slab, not a brochure

    What an ESD floor is made of, top to bottomESD topcoat5 to 7 mils applied, 6 typicalConductive basecoatcarries the charge across the floorGrounding networktied into the building groundPrimerbonds the system to the slabPrepared concreteopened mechanically, under 80% internal RHTO BUILDING GROUND
    The charge runs down through the system to the building ground. That path is what gets measured point to ground.

    Moisture and what is already down move a price further than anything else on this page. Photos start it, a site visit settles it, and that is our job rather than yours.

    03

    You get a number you can compare

    Our installed ESD flooring price range$6$16Bare slab, big room,daylight hoursOld coating off, wet slab,nights around productionPER SQUARE FOOT INSTALLED · OUR ESTIMATE, CONFIRMED ON YOUR SLABOur installed range, not a bid. Your number depends on the room.
    Where a floor lands in that range is decided by the slab and the schedule, not by the coating.

    Scope broken out line by line, so you can hold it against anything else on your desk without guessing what each bidder folded into their number.

    Price my floorfour answers
    Call Free quote