Conductive ESD flooring, Taylor, Texas

Fabrication and device work in Taylor puts a cleanliness rating and an ESD specification on the same slab, and the routine protecting one is how facilities lose the other. Measured here: semiconductor fab.

2.5 x 104 to 1.0 x 106ohmsANSI/ESD STM7.1 / ASTM D257 (as cited on manufacturer TDS)
under 1.0 x 109ohmsANSI/ESD STM97.1
100percent solidsmanufacturer TDS

The measured record for Taylor

Taylor is on the list because of the fabrication and equipment work measured here in Williamson County. Each signal below carries the source it was verified against.

01semiconductor fab

Samsung's $17 billion Taylor, Texas fab is in equipment installation and commissioning

Samsung's $17 billion Taylor, Texas fab is in equipment installation and commissioning, targeting 2027 production start, with about 1,500 permanent employees expected on site by the end of 2026; a second fab (Taylor Fab 2) is set to break ground in late 2026.

Source, verified 2026-09-05

Where conductive and static dissipative sit on the resistance scale 10³10⁴10⁵10⁶10⁷10⁸10⁹10¹⁰10¹¹10¹²10¹³ CONDUCTIVE STATIC DISSIPATIVE INSULATIVE 2.5 x 10⁴ to 1.0 x 10⁶ ohms. Fastest bleed. Specified where a spark is the hazard. Anything above 10⁹ is an insulator and holds a charge instead of moving it. ANSI/ESD STM7.1 · bands published by the ESD Association
The two static control bands, drawn where they sit on the scale. Everything to the right of 10⁹ ohms is an insulator.

Two specs on one slab

A classified room in Taylor has to hold its ISO 14644-1 particle class and its ESD resistance band at the same time, and the routine that protects the first one is the usual way facilities lose the second.

Getting there. Crew travels from Houston/Spring (via US-290/SH-130).

The document behind a Taylor job

ASTM F2170-19a is the one worth reading first for work like this. Determines relative humidity inside a concrete slab with in situ probes. This is the test a slab has to pass before an epoxy topcoat goes down.

01

Why moisture decides the job

Water vapour moving up through a slab pushes against the underside of a coating. If the slab is too wet when the system goes down, the floor can debond later regardless of how well it was installed. This is the single most common reason a resinous floor fails early.

Questions from Taylor

Can you work inside a live Taylor fab environment?

That depends on the room's protocol, the containment you require and the handover windows available. It is a real conversation rather than a yes or no. Send us the room and the protocol.

How soon can you get to Taylor?

Tell us the timing you are working against and we will give you a real date rather than a placeholder. Crews work Williamson County alongside the rest of the Texas schedule. Send the details.

Do you handle the whole job in Taylor or just the coating?

The whole job: removing what is down, preparing the slab, the grounding network, the system itself and the cure schedule around your operation. Prep and grounding are where most of the work is. How it runs.

Also in Austin-Round Rock

Crews working Taylor cover Austin, Round Rock, Hutto, Baytown on the same run, so a job in Williamson County rarely stands on its own.

Sources

Publishers cited on this page, and how many times each one is citedesda.org1iso.org1
2 citations on this page, across 2 publishers. Every figure above is one of them.
  1. ANSI/ESD S20.20-2021, the ESD control program standard for electronics handling

    ESD control program requirements (administrative and technical) for any organization that handles ESD-sensitive electrical or electronic parts.

    www.esda.org
  2. ISO 14644-1:2015, cleanroom classification by airborne particle concentration

    Cleanroom classification by airborne particle concentration (ISO Class 1 through 9); referenced when an ESD floor also has to hold a cleanroom particulate rating.

    www.iso.org

Every number on this page came from one of those documents. Send us the room and we will tell you which of them your floor has to answer to.