Four answers and we can price it
Four answers and we can price your ESD floor
Square footage, what is on the slab now, the resistance band your specification calls for, and the hours the space can be handed over. That is enough to price the actual job instead of a range.
24 hours to foot traffic.
7 days to full vehicle and forklift traffic.
A colder room runs longer About 36 hours to foot traffic at 50 F.

ESD Flooring TexasSend it over
Nothing here is required except a way to reach you. Partial information is fine, we will ask about the rest.
0 of 5 answered
What happens next
Three steps, and only the first one needs anything from you.
You send what you are holding
Conductive 2.5 x 104 to 1.0 x 106 ohms. Fastest bleed. Specified where a spark is the hazard.
Insulative Anything above 109 is an insulator and holds a charge instead of moving it.
A specification section, an audit finding, a customer requirement, even a photo of the slab. That document names the band, the test method and what has to be handed over at the end, which is most of the pricing decision already made.
We read the slab, not a brochure
To building ground
Moisture and what is already down move a price further than anything else on this page. Photos start it, a site visit settles it, and that is our job rather than yours.
You get a number you can compare
Low end Bare slab, big room, daylight hours.
High end Old coating off, wet slab, nights around production.
Scope broken out line by line, so you can hold it against anything else on your desk without guessing what each bidder folded into their number.