Dallas-Fort Worth-ArlingtonDallas County
ESD flooring in Dallas, to 2.5 x 104 to 1.0 x 106 ohms
Racks, dispatch desks and network positions in Dallas carry a static requirement that comes from the equipment rather than from any production process. The record here shows data centers.
What is actually in Dallas
These are the Dallas operations that run static sensitive equipment, each one verified against the document named beside it.
Crow Holdings has announced a flagship data center campus in Central Dallas planned
Crow Holdings has announced a flagship data center campus in Central Dallas planned for up to 245 MW, and Digital Realty operates the Infomart at 1950 Stemmons Freeway, described as one of the largest network interconnection hubs in the world.
Uptime is the constraint
Two things change on a Dallas job with live racks in the room. The band is often set higher for the safety of anyone working near energized gear, and the handover window becomes the plan.
The document behind a Dallas job
CSI 09 67 23 is the one worth reading first for work like this. Resinous Flooring. The MasterFormat section a resinous ESD system is specified under, because there is no dedicated static control resinous number.
There is no dedicated resinous ESD section
MasterFormat has no static control subsection under 09 67 23. The one dedicated static control flooring number, 09 65 36, governs resilient tile and sheet goods, which is a different product category from a resinous coating.
Questions from Dallas
Can you do this without taking our Dallas room offline?
Usually, by working the space in sections around the equipment. The constraint is cure time, not application time: 24 hours before anyone walks on it at 70 F and 50 percent relative humidity[7]. Tell us how the hall is zoned and we will build the sequence backwards from your uptime requirement.
How soon can you get to Dallas?
Tell us the timing you are working against and we will give you a real date rather than a placeholder. Crews work Dallas County alongside the rest of the Texas schedule. Send the details.
Can you look at our Dallas floor before we commit to anything?
Yes, and for an existing floor that is the sensible first step. Measuring what you already have against your requirement often costs a fraction of replacing it, and plenty of floors pass. What pushes a floor out of range.
Also in Dallas-Fort Worth-Arlington
Crews working Dallas cover Richardson, Plano, Garland, McKinney on the same run, so a job in Dallas County rarely stands on its own.
Sources
- Conductive and dissipative ESD epoxy technical data sheet, resistance and cure figures
Cited here for the conductive flooring/coating resistance band. The ESD Association's own consumer-facing page states only the <= 1.0 x 106 ohm ceiling with no stated floor.
www.arcat.com - FAA-STD-019, floor resistance and grounding requirements for FAA facilities
Lightning and surge protection, grounding, bonding, and shielding for FAA facilities and electronic equipment.
staticworx.com
Every number on this page came from one of those documents. Send us the room and we will tell you which of them your floor has to answer to.
