Home/Industries/Munitions and energetics

Industry

ESD flooring for munitions and energetics

This is the one category where conductive flooring is mandatory rather than preferred. DESR 6055.09 names the rooms directly.

under 1.0 x 10^9ohmsANSI/ESD STM97.1
under 100voltsANSI/ESD STM97.2
2.5 x 10^4 to 1.0 x 10^6ohmsANSI/ESD STM7.1 / ASTM D257 (as cited on manufacturer TDS)

What is different about these rooms

01

The regulation names the areas

Ammunition load, assemble and pack. Explosives processing. Propellant casting. Pyrotechnic assembly. Energetics manufacturing. Conductive flooring is required in those rooms, not merely dissipative.

02

The hazard is the spark, not the part

In an energetics area a discharge is an ignition source. That is why the faster conductive band is specified instead of the gentler dissipative one.

03

Check the current regulation, not the predecessor

If your contract language cites DoD 4145.26-M, that is the predecessor document. The current regulation is DESR 6055.09, Edition 1 Change 2, dated 25 November 2025.

Sources

    Munitions and energeticsTexas wide
    Call Get a quote