This is the one category where conductive flooring is mandatory rather than preferred. DESR 6055.09 names the rooms directly.[10]
What is different about these rooms
The regulation names the areas
Ammunition load, assemble and pack. Explosives processing. Propellant casting. Pyrotechnic assembly. Energetics manufacturing. Conductive flooring is required in those rooms, not merely dissipative.
The hazard is the spark, not the part
In an energetics area a discharge is an ignition source. That is why the faster conductive band is specified instead of the gentler dissipative one.
Check the current regulation, not the predecessor
If your contract language cites DoD 4145.26-M, that is the predecessor document. The current regulation is DESR 6055.09, Edition 1 Change 2, dated 25 November 2025.
Sources
- Conductive and dissipative ESD epoxy technical data sheet, resistance and cure figures
Cited here for the conductive flooring/coating resistance band. The ESD Association's own consumer-facing page states only the <= 1.0 x 106 ohm ceiling with no stated floor.
www.arcat.com - DESR 6055.09, DoD explosives safety rule requiring conductive flooring in AA&E areas
Explosives safety standards for DoD operations; makes CONDUCTIVE (not merely dissipative) flooring mandatory in ammunition load/assemble/pack, explosives processing, propellant casting.
www.denix.osd.mil
Every number on this page came from one of those documents. Send us the room and we will tell you which of them your floor has to answer to.